Automatic commit. Thu Oct 4 00:00:10 WST 2012
[matches/honours.git] / research / TCS / 2012-10-03 / checklist
index edef6ce..b7500fd 100644 (file)
@@ -1,12 +1,12 @@
-# File opened at 2012-10-03 11:15:53.173897
-# Chamber Pressure = 1.14e-08
-# Deflection Voltage = -0.605
-# Title = Au on Si
-# Comment = Running script to check chamber properties
+# File opened at 2012-10-03 17:04:26.705987
+# Chamber Pressure = 1.41e-08
+# Deflection Voltage = -0.608
+# Title = Au(200min) on Si
+# Comment = Au layer still not visible (current too low?)
 # 602 Scale = 1e-6 x 0.1
-# Venault Voltage = 10.34
+# Venault Voltage = 10.35
 # Accelerating Voltage = 264
-# Focus Voltage = 8.18
+# Focus Voltage = 8.17
 # Initial Voltage = sweep
 # Heating Current = 1.149
 # Heating Voltage (across filament) = 1.181
@@ -17,9 +17,9 @@
 # 602 0.01 Battery = 8.20
 # 602 0.003 Battery = 8.18
 # 602 0.001 Battery = 8.22
-# Sample = Au (30min 4.0A e-8mbar) on Si
+# Sample = Au (60min + 20min 4.6A + 20min + 30min + 70min 4.0A e-8mbar)
 # Sample Angle = 142
 # ADC Regulator = 3.32
 # Data = time DAC ADC5 ADC5_sigma
-# Parameters last checked = 2012-10-03 11:15:53.173636
-# File closed at 2012-10-03 11:15:53.174448
+# Parameters last checked = 2012-10-03 17:04:26.705599
+# File closed at 2012-10-03 17:04:26.706667

UCC git Repository :: git.ucc.asn.au