Automatic commit. Thu Sep 20 00:00:02 WST 2012
[matches/honours.git] / research / ellipsometry / 2012-09-18 / readme
diff --git a/research/ellipsometry/2012-09-18/readme b/research/ellipsometry/2012-09-18/readme
new file mode 100644 (file)
index 0000000..aa94d70
--- /dev/null
@@ -0,0 +1,44 @@
+Arrive 12:10pm
+
+Plan:
+ - Prepare ellipsometer to take measurements of the Au on Black-Au on Au on Si sample.
+   - Need to recallibrate ellipsometer; takes about 30 min
+   - Take data from Si sample for reference
+   - Take data from Mikhail's sample(s)
+     - Take data from Jeremy's samples if possible
+ - Vent chamber, remove Au on Black-Au on Si sample
+   - Fix height of sample holder(s)
+   - Install new samples; Si substrate measured by ellipsometer, and one other sample (probably stainless steel)
+   - Do TCS for increasing thickness of Au on the samples
+   - Then do TCS for increasing thickness of Black-Au
+   - Then do TCS for increasing thickness of Au on top
+   - Finally, repeat ellipsometric measurements on the samples
+
+- Cooling fan for ellipsometer does not appear to works
+  - Had polarity of wires wrong
+  - When I swapped them the right way around, the fan spun up and then broke
+    - Probably because I had maxed out the voltage on the power supply
+  - So now it is actually broken
+  - Will need to get a replacement
+  - Continue anyway without fan.
+
+- Take Rp and Rs spectrum of control sample (Si wafer)
+
+- Realign gun
+  - Resistance of filament 1.8R
+- Realign sample holder
+  - Check for shorts; everything seems fine
+
+- Take Rp and Rs spectrum of Au+BlackAu+Au on Si sample
+- Also take Psi/Del spectrum
+
+- Discovered at some point... the sample fell off the sample mount
+  - Not sure exactly when...
+  - God dammit
+  - Will repeat tomorrow
+
+- Go home at 17:00
+
+
+
+

UCC git Repository :: git.ucc.asn.au