Automatic commit. Sat Sep 8 00:00:03 WST 2012
[matches/honours.git] / research / TCS / 2012-09-07 / checklist.old
1 # File opened at 2012-09-07 17:08:42.153212
2 # Chamber Pressure = 2.83e-08
3 # Venault Voltage = 23.2
4 # Title = Reset
5 # Comment = Compare curve to 11am curve with original choice of potentials
6 # Accelerating Voltage = 126.6
7 # Focus Voltage = -6.79
8 # Deflection Voltage = 2.38
9 # Initial Voltage = sweep
10 # Heating Current = 1.141
11 # Heating Voltage (across filament) = 1.164
12 # Heating Voltage (across power supply) = 1.49
13 # 602 Zero = 0.02
14 # 602 Scale = 1e-6 x 0.1
15 # 602 0.1 Battery = 7.98
16 # 602 0.03 Battery = 7.75
17 # 602 0.01 Battery = 7.90
18 # 602 0.003 Battery = 7.88
19 # 602 0.001 Battery = 8.28
20 # ADC Regulator = 3.32
21 # Sample = Au on Si (95min 3.5A 3-6e-8mbar)
22 # Sample Angle = 135
23 # Data = time DAC ADC5 ADC5_sigma
24 # Parameters last checked = 2012-09-07 16:57:21.702495
25
26 # File closed at 2012-09-07 17:08:42.153571

UCC git Repository :: git.ucc.asn.au