TCS the final countdown...
[matches/honours.git] / research / TCS / 2012-10-15 / checklist.old
1 # File opened at 2012-10-16 07:19:26.004006
2 # Chamber Pressure = 4.96e-07
3 # Focus Voltage = -15.06
4 # Deflection Voltage = -7.50
5 # Accelerating Voltage = 384
6 # Venault Voltage = 2.33
7 # Title = BlackAg on Si2
8 # Comment = Evaporated BlackAg on Ag on Si2
9 # 602 Scale = 1e-6 x 0.1
10 # Initial Voltage = \
11 # Heating Current = 1.149
12 # Heating Voltage (across filament) = 1.155
13 # Heating Voltage (across power supply) = 1.425
14 # 602 Zero = 0.00
15 # 602 0.1 Battery = 8.3
16 # 602 0.03 Battery = 8.18
17 # 602 0.01 Battery = 8.28
18 # 602 0.003 Battery = 8.28
19 # 602 0.001 Battery = 8.20
20 # Sample = BlackAg (3min 3.5A 2e-2mbar) + Ag (5min 3.5A e-7mbar) on Si2
21 # Sample Angle = 147
22 # ADC Regulator = 3.3
23 # Data = time DAC ADC5 ADC5_sigma
24 # Parameters last checked = 2012-10-16 06:51:14.477202
25
26 # File closed at 2012-10-16 07:19:26.004341

UCC git Repository :: git.ucc.asn.au