Automatic commit. Thu Sep 20 00:00:02 WST 2012
[matches/honours.git] / research / ellipsometry / 2012-09-18 / readme
1 Arrive 12:10pm
2
3 Plan:
4  - Prepare ellipsometer to take measurements of the Au on Black-Au on Au on Si sample.
5    - Need to recallibrate ellipsometer; takes about 30 min
6    - Take data from Si sample for reference
7    - Take data from Mikhail's sample(s)
8      - Take data from Jeremy's samples if possible
9  - Vent chamber, remove Au on Black-Au on Si sample
10    - Fix height of sample holder(s)
11    - Install new samples; Si substrate measured by ellipsometer, and one other sample (probably stainless steel)
12    - Do TCS for increasing thickness of Au on the samples
13    - Then do TCS for increasing thickness of Black-Au
14    - Then do TCS for increasing thickness of Au on top
15    - Finally, repeat ellipsometric measurements on the samples
16
17 - Cooling fan for ellipsometer does not appear to works
18   - Had polarity of wires wrong
19   - When I swapped them the right way around, the fan spun up and then broke
20     - Probably because I had maxed out the voltage on the power supply
21   - So now it is actually broken
22   - Will need to get a replacement
23   - Continue anyway without fan.
24
25 - Take Rp and Rs spectrum of control sample (Si wafer)
26
27 - Realign gun
28   - Resistance of filament 1.8R
29 - Realign sample holder
30   - Check for shorts; everything seems fine
31
32 - Take Rp and Rs spectrum of Au+BlackAu+Au on Si sample
33 - Also take Psi/Del spectrum
34
35 - Discovered at some point... the sample fell off the sample mount
36   - Not sure exactly when...
37   - God dammit
38   - Will repeat tomorrow
39
40 - Go home at 17:00
41
42
43
44

UCC git Repository :: git.ucc.asn.au